Buchi R-100 Rotavapor System with Chiller
The Buchi R-100 Rotavapor System with Chiller is an advanced solution for high-speed, single-stage distillations with minimal stress on samples. It includes the versatile Buchi B-100 Heating Bath, which offers digital temperature control from 20°C to 95°C and a 4L capacity. The system’s modular design allows for customization with various glassware assemblies, enhancing its adaptability for different laboratory needs. Key features of the R-100 Rotavapor include a rotation speed range of 20 to 280 rpm and a pressure tolerance of up to 6 bar on the condenser coil. The accompanying V-100 Vacuum Pump delivers impressive performance with a final vacuum of less than 10 mbar and a pumping volume of 1.5 m³/h, along with a power consumption of 150W. This pump, combined with the system's multifunctional valve unit, ensures precise vacuum control and efficient operation.
The system is also equipped with the Buchi I-100 Interface, enhancing vacuum control and monitoring with a measurement range of 0 to 1,400 mbar and accuracy of ± 2 mbar post-calibration. It features automatic hysteresis adjustment or manual setting from 1 to 500 mbar, with a regulating range of 0 to 1,100 mbar, and consumes 30W of power. To complement the Rotavapor system, the Buchi F-105 Chiller provides reliable cooling with a temperature range of -10°C to 25°C, accuracy of ± 1°C, and cooling capacity of 530W.
All of our equipment is fully tested to perform at factory specifications before being shipped.
TheBuchi R-100 Rotavapor System with Chiller includes:
- > Coil Glassware (Dry Ice Condenser is Pictured)
- > 1 Liter Evaporating Flask
- > 1 Liter Receiving Flask
- > Recertified Buchi F-105 Chiller, 530W or Brand-New Polyscience BA06A1G3-310A13C Chiller, 900W (Additional $1,500.00)
- > Buchi B-100 Heating Bath
- > V-100 Diaphragm Pump
- > I-100 Interface Module
- > Vacuum Tubing and Connectors
- > Power Cord
- > Full 180 Day Parts and Labor Warranty
Buchi R-100 Rotavapor System with Chiller Specifications
|
Buchi R-100 Rotavapor System Specifications
|
|
|
Rotation Speed |
20 to 280 rpm |
|
Temperature Control |
20 ° to 95°C |
|
Bath Capacity |
4L |
|
Pressure Load on Condenser Coil |
Max 6 bar |
|
V-100 Vacuum Pump Specifications
|
|
|
Final Vacuum Possible
|
< 10 mbar
|
|
Pumping Volume
|
1.5mᶟ/h
|
|
Power Consumption
|
150 W |
|
B-100 Heating Bath Specifications
|
|
|
Control
|
Analog Control Knobs
|
|
Temperature Range
|
20 to 95
°C |
|
Temperature Accuracy
|
+ 1°C |
|
Buchi I-100 Interface Specifications
|
|
|
Vacuum Measurement Range |
0 to 1,400 mbar |
|
Vacuum Measurement Accuracy |
± 2 mbar (after calibration at constant temperature) |
|
Hysteresis |
Automatic or 1 to 500 mbar |
|
Regulating Range |
0 to 1,100 mbar |
|
Power Consumption |
30W |
|
|
|
| Temperature Range | -10°C to 25°C |
| Temperature Stability | ± 1°C |
| Cooling Capacity | 530W |
| Maximum Flow Rate | 2.5L/min (0.66 gpm) |
| Electrical Requirements | 115V, 60Hz, 8A |
- Inspect all glassware for chips or cracks, reapplying vacuum grease to stopcocks to ensure a secure seal
- Examine displays, replacing any dim or dead pixels to maintain clear visibility
- Verify drive motor RPM using a tachometer for accurate rotational speed
- Confirm the ease of raising and lowering the tower, lubricating as needed for smooth operation
- Check the Woulff bottle for any leaks or structural breakages, ensuring airtight performance
- Disassemble and inspect the vacuum pump, cleaning and replacing seals or components as necessary
- Inspect internal wiring for each component, checking for any frays, cuts, or potential breakages
- Examine all hoses, hose barbs, and seals for signs of wear or leaks, ensuring integrity
- Inspect the vapor duct seal and replace if compromised to maintain vacuum efficiency
- Verify and calibrate the vacuum controller for accurate pressure regulation
- Confirm all hoses and cables are securely fastened to prevent disconnections or leaks
- Check heat bath temperatures against settings to ensure precise thermal control
- Confirm the final system vacuum level meets manufacturer specifications
- Ensure cosmetic condition meets standards, with no damage impacting function or appearance
Technician Inspection and Recertification Checklist: Rotary Evaporators
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect all glassware for chips or cracks, apply vacuum grease to stopcocks | Completed | |
| Examine displays and replace dim/dead pixels | Completed | |
| Verify drive motor RPM with tachometer | Completed | |
| Confirm ease of raising/lowering tower, lubricate if needed | Completed | |
| Check Woulff bottle for leaks or structural issues | Completed | |
| Disassemble and inspect vacuum pump, clean/replace parts as needed | Completed | |
| Inspect internal wiring for frays, cuts, or breakages | Completed | |
| Examine hoses, hose barbs, and seals for leaks | Completed | |
| Inspect vapor duct seal, replace if compromised | Completed | |
| Verify and calibrate vacuum controller | Completed | |
| Confirm hoses and cables are securely fastened | Completed | |
| Check heat bath temperatures for accurate control | Completed | |
| Confirm final system vacuum level meets specifications | Completed | |
| Ensure cosmetic condition meets standards | Completed |


Click Here to View the Technical Specs for the Buchi R-100 Rotavapor System with Chiller