Buchi R-300 Rotavapor System with V-700 Vacuum Pump and Chiller
The Buchi R-300 Rotavapor System with V-700 Vacuum Pump and Chiller meets the highest expectations of convenience and versatility in rotary evaporation. The Buchi R-300 Rotavapor is paired with the Buchi V-700 Vacuum Pump, I-300 Interface, B-305 Water Bath, and a chiller of your choice to perform gentle and quick solvent distillations, solvent recycling, chemical purifications, and concentrations of suspensions and solutions. The R-300 is capable of processing volumes from 50mL up to 5L, and would feature a temperature range of 20°C to 220°C covering a broad range of possible applications. The Buchi R-300 Rotavapor System provides you with maximum convenience to conduct rotary evaporation in the lab. This system can also easily be operated with features such as one-touch interface commands, fast flask handling with the Combi-Clip, options to manually adjust system parameters with intuitively placed buttons, and much more.
The Buchi R-300 Rotavapor System with V-700 Vacuum Pump and Chiller includes:
- > Coil Glassware
- > B-305 Heating Bath
- > V-700 Vacuum Pump
- > I-300 Interface
- > Recertified Buchi F-105 Chiller, 530W or Brand-New Polyscience BA06A1G3-310A13C Chiller, 900W (Additional $1,500.00)
- > Vacuum Controller to Interface Cable
- > 1 Liter Evaporating Flask
- > 1 Liter Receiving Flask
- > Solenoid Value Unit w/ Wouff Bottle
- > All Essential Vacuum Tubing and Power Cords
- > Full 180 Day Parts and Labor Warranty
Buchi R-300 Rotavapor System with V-700 Vacuum Pump and Chiller Specifications
|
|
|
|
Maximum Flask Size |
5L |
|
Vertical Adjustment Range |
220 mm |
|
Rotation Speed Range |
10 to 280 RPM |
|
Temperature Range |
+20°C to +220°C |
|
Condenser |
Coil Condenser |
|
Capacity Range |
50 mL – 5L |
|
Electrical Requirements |
100 - 240VAC, 50/60Hz, 100W |
|
|
|
|
Vacuum Measurement Range |
0 to 1300 Millibar |
|
Vacuum Measurement Accuracy |
± 2 mbar (after calibration at constant temperature) |
|
Hysteresis |
Automatic or 1 to 200 mbar |
|
Regulating Range |
Ambient Pressure to 0 mbar |
|
Power Consumption |
12W |
|
|
|
|
Temperature Range |
+20°C to +220°C |
|
Temperature Adjustment |
± 1°C |
|
Regulation Precision |
At 60°C: ±1°C
|
| Heating Fluid | Water/Oil |
| Maximum Bath Capacity | 5.5L |
|
Electrical Requirements |
100 - 120VAC, 50/60 Hz, 1500W |
|
|
|
| Ultimate Vacuum (Absolute) | < 10 mbar |
| Suction Capacity | 1.8 mᶟ/h |
| Maximum Pump Speed | 1600 RPM |
| Vacuum Connection | GL-14 |
| Electrical Requirements | 100-240VAC, 50/60Hz, 210W |
|
|
|
| Temperature Range | -10°C to 25°C |
| Temperature Stability | ± 1°C |
| Cooling Capacity | 530W |
| Maximum Flow Rate | 2.5L/min (0.66 gpm) |
| Electrical Requirements | 115V, 60Hz, 8A |
- Inspect all glassware for chips or cracks, reapplying vacuum grease to stopcocks to ensure a secure seal
- Examine displays, replacing any dim or dead pixels to maintain clear visibility
- Verify drive motor RPM using a tachometer for accurate rotational speed
- Confirm the ease of raising and lowering the tower, lubricating as needed for smooth operation
- Check the Woulff bottle for any leaks or structural breakages, ensuring airtight performance
- Disassemble and inspect the vacuum pump, cleaning and replacing seals or components as necessary
- Inspect internal wiring for each component, checking for any frays, cuts, or potential breakages
- Examine all hoses, hose barbs, and seals for signs of wear or leaks, ensuring integrity
- Inspect the vapor duct seal and replace if compromised to maintain vacuum efficiency
- Verify and calibrate the vacuum controller for accurate pressure regulation
- Confirm all hoses and cables are securely fastened to prevent disconnections or leaks
- Check heat bath temperatures against settings to ensure precise thermal control
- Confirm the final system vacuum level meets manufacturer specifications
- Ensure cosmetic condition meets standards, with no damage impacting function or appearance
Technician Inspection and Recertification Checklist: Rotary Evaporators
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect all glassware for chips or cracks, apply vacuum grease to stopcocks | Completed | |
| Examine displays and replace dim/dead pixels | Completed | |
| Verify drive motor RPM with tachometer | Completed | |
| Confirm ease of raising/lowering tower, lubricate if needed | Completed | |
| Check Woulff bottle for leaks or structural issues | Completed | |
| Disassemble and inspect vacuum pump, clean/replace parts as needed | Completed | |
| Inspect internal wiring for frays, cuts, or breakages | Completed | |
| Examine hoses, hose barbs, and seals for leaks | Completed | |
| Inspect vapor duct seal, replace if compromised | Completed | |
| Verify and calibrate vacuum controller | Completed | |
| Confirm hoses and cables are securely fastened | Completed | |
| Check heat bath temperatures for accurate control | Completed | |
| Confirm final system vacuum level meets specifications | Completed | |
| Ensure cosmetic condition meets standards | Completed |


Click Here to View the Technical Specs for the Buchi R-300 Rotavapor System with V-700 Vacuum Pump and Chiller