Corning PC 410D Digital Stirrer
Corning PC 410D Digital Stirrer features dial controls for stir, an indicator light for power and a 5" X 7" platform. Speeds from 60 to 1,150 RPM. Power: 120V.
All of our equipment will be fully tested to perform at factory specifications before being shipped.
The Corning PC 410D Digital Stirrer includes:
- > Power Cord
- > Full 180 Day Parts and Labor Warranty
Corning PC 410D Digital Stirrer Specifications
|
Stirrer Speed |
60 to 1,150 RPM |
|
Platform Size |
5 x 7 in (12.7 x 17.8 cm) |
|
Electrical Requirements |
120V, 60Hz, 0.7A, 73W |
- Inspect the display for clarity and brightness, replacing any dim or dead pixels to ensure optimal performance.
- Examine external regulators for structural integrity and damage, replacing if necessary (if applicable).
- Assess the functionality of temperature, COâ‚‚, and Hâ‚‚O sensors, verifying accuracy and consistency (if applicable).
- Check all internal wiring for frays, tears, or breakages, addressing any compromised sections.
- Confirm software settings are properly configured to match the specifications of internal components.
- Inspect and clean the fan for efficient airflow, replacing if wear or malfunction is detected.
- Verify the condition of wheels and leveling mounts, ensuring stability and ease of movement.
- Inspect door gaskets and latches for sealing integrity, replacing if compromised to maintain proper enclosure.
- Calibrate temperature accuracy to 37°C using an NIST-traceable temperature probe for precision.
- Calibrate COâ‚‚ levels to 5% using a Fyrite combustion test kit to verify environmental control (if applicable).
- Confirm temperature and COâ‚‚ stability over a 24-hour period to ensure consistent conditions.
- Conduct a cosmetic inspection, verifying the unit meets appearance and cleanliness standards.
Technician Inspection and Recertification Checklist
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect display for clarity and replace if needed | Completed | |
| Examine external regulators for integrity and damage | Completed | |
| Assess temperature, COâ‚‚, and Hâ‚‚O sensors for accuracy | Completed | |
| Check internal wiring for frays, tears, or breakages | Completed | |
| Confirm software settings match internal component specs | Completed | |
| Inspect and clean fan, replacing if wear is detected | Completed | |
| Verify condition of wheels and leveling mounts | Completed | |
| Inspect door gaskets and latches for sealing integrity | Completed | |
| Calibrate temperature to 37°C with NIST-traceable probe | Completed | |
| Calibrate COâ‚‚ to 5% with Fyrite combustion test kit | Completed | |
| Confirm 24-hour temperature and COâ‚‚ stability | Completed | |
| Conduct cosmetic inspection to ensure appearance standards | Completed |
Click Here to View all the Technical Specs for the PC-410D


Click Here to View the Technical Specs for the PC-410D