Corning PC 520 Hot Plate Stirrer
Corning PC 520 Stirrer/Hotplate features dial controls for stir and heat, an indicator light for power and a 10" X 10" platform. Power: 120V.
All of our equipment is in excellent condition and fully tested before shipping.
The Corning PC 520 Hot Plate Stirrer includes:
- > Power Cord
- > Operator's Manual
- > Full 180 Day Parts and Labor Warranty
Corning PC 520 Hot Plate Stirrer Specifications:
|
Temperature Range |
25°C to 550°C |
|
Stirrer Speed |
60 to 1,100 RPM |
|
Platform Size |
10 x 10 in (25.4 x 25.4 cm) |
|
Electrical Requirements |
120V, 60Hz, 9.3A, 1113W |
- Inspect the display for clarity and brightness, replacing any dim or dead pixels to ensure optimal performance.
- Examine external regulators for structural integrity and damage, replacing if necessary (if applicable).
- Assess the functionality of temperature, COâ‚‚, and Hâ‚‚O sensors, verifying accuracy and consistency (if applicable).
- Check all internal wiring for frays, tears, or breakages, addressing any compromised sections.
- Confirm software settings are properly configured to match the specifications of internal components.
- Inspect and clean the fan for efficient airflow, replacing if wear or malfunction is detected.
- Verify the condition of wheels and leveling mounts, ensuring stability and ease of movement.
- Inspect door gaskets and latches for sealing integrity, replacing if compromised to maintain proper enclosure.
- Calibrate temperature accuracy to 37°C using an NIST-traceable temperature probe for precision.
- Calibrate COâ‚‚ levels to 5% using a Fyrite combustion test kit to verify environmental control (if applicable).
- Confirm temperature and COâ‚‚ stability over a 24-hour period to ensure consistent conditions.
- Conduct a cosmetic inspection, verifying the unit meets appearance and cleanliness standards.
Technician Inspection and Recertification Checklist
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect display for clarity and replace if needed | Completed | |
| Examine external regulators for integrity and damage | Completed | |
| Assess temperature, COâ‚‚, and Hâ‚‚O sensors for accuracy | Completed | |
| Check internal wiring for frays, tears, or breakages | Completed | |
| Confirm software settings match internal component specs | Completed | |
| Inspect and clean fan, replacing if wear is detected | Completed | |
| Verify condition of wheels and leveling mounts | Completed | |
| Inspect door gaskets and latches for sealing integrity | Completed | |
| Calibrate temperature to 37°C with NIST-traceable probe | Completed | |
| Calibrate COâ‚‚ to 5% with Fyrite combustion test kit | Completed | |
| Confirm 24-hour temperature and COâ‚‚ stability | Completed | |
| Conduct cosmetic inspection to ensure appearance standards | Completed |


Click Here to View the Technical Specs for the PC-520