Gilson P10 Pipette Classic Large Plunger
Gilson P10 Pipette Large plunger. Gilson PIPETMAN P10 is a variable volume air displacement pipette for dispensing volumes between 1µl and 10µl with precision accuracy and ease. Ideal for molecular biology techniques, including DNA, PCR, and sequencing.
All of our equipment will be fully tested to perform at factory specifications before being shipped.
The Gilson P10 Pipette Classic Large Plunger includes:
- > Gravimetric Analysis Calibration
- > Full 180 Day Parts and Labor Warranty
Gilson P10 Pipette Classic Large Plunger Specifications
|
Volume µl |
Increment µl |
Relative Accuracy (%) |
Absolute Accuracy (µl) |
Relative Precision (%) |
Absolute Precision (%) |
|
1 5 10 |
0.02 0.02 0.02 |
2.5 1.5 1 |
0.025 0.075 0.1 |
1.2 0.6 0.4 |
0.012 0.03 0.04 |
- Thoroughly inspect and clean all internal components, identifying and replacing any damaged or compromised parts
- Replace all essential wear components, including O-rings, seals, tip holders, and friction rings, to ensure optimal performance
- Examine plunger and seal holders for signs of rust, wear, or damage, replacing components as necessary for operational integrity
- Verify that no leakage is present by aspirating a sample and observing for any fluid loss
- Confirm that the Mettler Toledo AB104-S balance is precisely calibrated for accurate pipette calibration measurements
- Perform a detailed gravimetric calibration, recording all findings in the comprehensive calibration report
- Ensure that all external parts are meticulously cleaned and free from any foreign contaminants
- Test the tip ejector for smooth and reliable operation, addressing any misalignment or obstruction
- Affix a dated calibration sticker to indicate recent and verified calibration
- Conduct a detailed cosmetic inspection, confirming that all surfaces and finishes meet established quality and aesthetic standards
Technician Inspection and Recertification Checklist: Pipettes
The Following Checklist Is to Be Performed on All Incoming and Outgoing Pieces of Equipment| Task | Completed? | Remarks? |
| Thoroughly inspect and clean all internal components; replace damaged parts | Completed | |
| Replace essential wear components like O-rings, seals, and friction rings | Completed | |
| Examine plunger and seal holders for wear or damage; replace if needed | Completed | |
| Verify no leakage is present by aspirating sample and checking for fluid loss | Completed | |
| Confirm Mettler Toledo AB104-S balance calibration for accurate measurements | Completed | |
| Perform detailed gravimetric calibration and record findings in report | Completed | |
| Clean all external parts meticulously to remove any contaminants | Completed | |
| Test tip ejector for smooth, reliable operation; correct misalignments | Completed | |
| Affix dated calibration sticker to indicate verified calibration | Completed | |
| Conduct cosmetic inspection to ensure quality of surfaces and finishes | Completed |

