Rainin Rabbit Plus Peristaltic Pump
Flow Range
1 to 1300 ml/hr
Speed Range
1 to 48 RPM
Head
4 Channel Head
- Digital control with intuitive keypad for easy operation
- Pressure rating of 71 psi for reliable liquid transfer
- Compact design (14 x 14 x 24 cm) saves valuable bench space
- Fast-fill "rabbit" button for quick tubing priming and purging
- RS-422 connector enables computer-controlled operation
- Compatible with 120V electrical requirements for standard lab use
The Rainin Rabbit Plus Peristaltic Pump includes:
- > 4-Channel Head
- > Power Cord
- > Full 180 Day Parts and Labor Warranty
Rainin Rabbit Plus Peristaltic Pump Specifications
|
Flow Range |
1 to 1300 ml/hr |
|
Speed Range |
1 to 48 RPM |
|
Speed Stability |
1% for 10% Voltage Variation |
|
Pressure |
71 psi |
|
Dimensions (L x W x H) |
14 x 14 x 24cm |
|
Weight |
12 lbs |
|
Electrical |
120V |
- Verify power supply and PCB voltage outputs for accuracy and stability
- Inspect display for dim or dead pixels, replacing any compromised segments
- Test full functionality of speed, time, and start/stop buttons
- Confirm proper bidirectional rotation of the pump head
- Examine all internal wiring within the casing for secure and intact connections
- Inspect pump head for any blockages or obstructions that could hinder rotation
- Confirm functionality of the fan, replacing if performance is suboptimal
- Inspect and clean the internal casing to maintain optimal conditions
- Verify RPM of pump head using a NIST-traceable tachometer
- Conduct a cosmetic inspection to ensure all surfaces meet quality standards
Technician Inspection and Recertification Checklist: Peristaltic Pumps
The Following Checklist Is to Be Performed on All Incoming and Outgoing Pieces of Equipment| Task | Completed? | Remarks? |
| Verify power supply and PCB voltage outputs for accuracy and stability | Completed | |
| Inspect display for dim or dead pixels; replace any compromised segments | Completed | |
| Test full functionality of speed, time, and start/stop buttons | Completed | |
| Confirm proper bidirectional rotation of the pump head | Completed | |
| Examine all internal wiring for secure and intact connections | Completed | |
| Inspect pump head for blockages or obstructions | Completed | |
| Confirm fan functionality, replacing if performance is suboptimal | Completed | |
| Inspect and clean internal casing to maintain optimal conditions | Completed | |
| Verify RPM of pump head using a NIST-traceable tachometer | Completed | |
| Conduct cosmetic inspection to ensure all surfaces meet quality standards | Completed |

