Thermo Scientific Haake S7/AC150 Heated Circulator
Temperature Range
Ambient +13°C to 150°C (Ambient +23°F to 302°F)
Heater Capacity
1200W
Pump Maximum Flow Rate
20L/min (5.3 gpm)
- Advanced immersion circulator design supports both internal bath use and external circulation
- Digital display with touchpad controls provides clear monitoring and simple parameter adjustment
- Adjustable high-temperature protection enhances operational safety
- Integrated acoustic and visual alarms notify users of critical system conditions
- Reservoir capacity supports efficient fluid circulation for laboratory temperature control
- Designed for reliable operation in clean laboratory environments
All of our equipment will be fully tested to perform at factory specifications before being shipped.
The Thermo Scientific Haake S7/AC150 Heated Circulator includes:
- > Reservoir Cover
- > Power Cord
- > Operator's Manual
- > Full 180 Day Parts and Labor Warranty
Thermo Scientific Haake S7/AC150 Heated Circulator Specifications
| Temperature Range | Ambient +13°C to 150°C (Ambient +23°F to 302°F) |
| Reservoir Volume | 4 to 8L (1.1 to 2.1 gal.) |
| Maximum Flow Rate | 20L/min (5.3 gpm) |
| Maximum Pressure | 475 mbar (6.89 psi) |
| Heater Capacity | 1200W |
| Dimensions (W x D x H) |
Heated Immersion Circulator: 6.4 x 7.8 x 14.6 in. (16.5 x 19.9 x 37.2 cm)
Heated Bath Circulator Circulator: 9.2 x 16.7 x 19.5 in. (23.5 x 42.8 x 49.4 in.) |
| Weight | 32.7 lb. (14.8 kg) |
| Electrical Requirements | 115V, 50/60Hz, 11.3A |
- Inspect display for dimming or dead pixels and replace as necessary to maintain clear visual feedback
- Verify functionality of all buttons and input devices, ensuring reliable and responsive control
- Check that all external hosing connections are secure and properly installed to prevent leakage
- Test unit flow rate on a closed-loop system to confirm consistent fluid dynamics
- Examine all external surfaces for leaks, confirming a sealed and contained system
- Inspect internal components for any signs of leaks to ensure system integrity
- Verify power supply output for accurate voltage delivery per operational specifications
- Inspect all internal wiring, checking for any frays, tears, or compromised insulation
- Replace internal filters to maintain optimal fluid purity and system performance
- Confirm that the fan operates at proper speeds to provide effective cooling
- Verify compressor functionality for consistent performance and cooling efficiency
- Test cooling capacity, confirming it meets performance specifications at 20°C
- Measure water pump output to confirm correct PSI for stable fluid flow
- Determine the lowest achievable temperature, verifying against manufacturer standards
- Ensure cosmetic condition meets standards with no damage affecting functionality or aesthetics
Technician Inspection and Recertification Checklist: Recirculating Chiller
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect display for dimming or dead pixels, replace if necessary | Completed | |
| Verify functionality of all buttons and input devices | Completed | |
| Ensure external hosing connections are secure | Completed | |
| Test flow rate on closed-loop system | Completed | |
| Inspect for external leaks | Completed | |
| Inspect for internal leaks | Completed | |
| Verify power supply output voltage | Completed | |
| Inspect internal wiring for frays or tears | Completed | |
| Replace internal filters | Completed | |
| Confirm fan functionality | Completed | |
| Verify compressor functionality | Completed | |
| Test cooling capacity at 20°C | Completed | |
| Confirm water pump PSI output | Completed | |
| Determine lowest achievable temperature | Completed | |
| Ensure cosmetic condition meets standards | Completed |

Click Here to View the Technical Specs for the Thermo Scientific Haake S7/AC150 Heated Circulator